Case Study from Liburnia Group

Liburnia Case study

Liburnia Team always on the road.

A long and heavy journey. Dosan Skoda Power needed some help to deliver this huge steam turbine from Czech Republic to the UK.

Bravo, awesome work from Liburnia Group πŸ‘

#girn #liburniagroup #project #logistics #global #industrial #relocation #network #project #factoryrelocationprojectplan #industrialplantrelocation #factoryrelocation #movingafactory #Industrialrelocation #plantrelocation #globalrelocators

Case Study from Max Loads

maxloads challenge

Max Loads can stand this challenge high above the ground too, lifting huge server house to the top of an airport.

For any logistics inquiry, please contact: +40 358 401 139 | +40 740 153 187 | office@maxloads.ro

Details:

To build a server house in an airport located in Palma de Mallorca Max Loads Team had delivered all the machines and tools. While the location did not allow they needed autocranes to put the machines on the top of the building and then they carry all of them in.

Top effort from Max Loads Team again. πŸ‘πŸ‘

#girn #maxloads #project #logistics #global #industrial #relocation #network #project #factoryrelocationprojectplan #industrialplantrelocation #factoryrelocation #movingafactory #Industrialrelocation #plantrelocation #globalrelocators

Case Study from 7WL

7wlpakistan

Relocation of a coal power plant from Southern Germany to Pakistan

A great journey starts with massive planning.

7WL started a relocation from Southern Germany to Pakistan with 250 containers and 80tons Bulk Cargos. This is a very challenging task but not for these guys.

Details:
After some time which was used for planning of dismantling, the dismantling work itself and transport planning, 7WL can report about successful start of a relocation of a coal power plant from Southern Germany to Pakistan.
With a total volume of 250 containers and around 3000cbm of Break Bulk cargo this project is again a challenge which was accepted and managed by 7WL project team.

At this stage to our GIRN and EPN partner CHS Bremen for supporting us with a large number of good 2nd hand containers in a perfect condition at the right time and place.
7WL delivered them by side loader equipment to jobsite where the dismantling team of POL-Inowex took care about stuffing, lashing and securing. After some days they exchanged those containers at site with new empty container and delivered the full containers by barge to the seaport of Rotterdam where the same got loaded on FCL vessel towards Pakistan.

Additionally the break bulk movements started as well.
The biggest challenge they managed was to move units with weights up to 80 tons and dimensions up to 5 meter height and 4.8 meter width from site to nearest inland port – in this case Basel. During next week the first parcel of around 2000cbm will get loaded on CP Break Bulk vessel β€œCP GALAXY” heading to Karachi Pakistan. The second OOG Lot is planned for departure around end of June.

Keep up the good work 7WLπŸ‘

#7WL #pakistan #dismantling #relocation #girn #transport #plan #bremen #germany #epn #chs #polinowex #teamwork #rotterdam #karachi #projectlogistics

Case Study from KLOSE

klose project

As always Klose Industrial Service is always reliable.

Due to their professionalism they can do anything in no time.

FACTORY RELOCATION – On-going factory relocation project from penang to selangor. A particular Customer in the foodandbeverageindustry are transferring their equipments in phases to ensure as minimum disruption as possible to their production.

Team Klose is always flexible and ready to support in such scenarios. πŸ‘Œ

#girn #globalindustrialrelocationnetwork #network #kloseindustrialservice #project