Tag Archives: maxloads

Max Loads – 3 transformers installed in the future BMW factory in Debrecen

GIRN MAXLOADS 3 transformers installed in the future BMW factory in Debrecen

Member News from Max Loads
3 transformers installed in the future BMW factory in Debrecen(Hungary)

Details:

  • 3 Siemens transformers
  • 6200 x 2400 x 3440
  • 61.1 tons each

  • With a team of 8 people on site
  • 25t forklift, truck with 10t crane and a big crane of 75t
  • Of course the hand tools and the rigging tools

At the future BMW factory in Debrecen they installed 3 transformers, which they put in their final place, installed all the ancillary equipment and filled with oil.

It was a project for approximately 3 month


Congratulations for the wonderful work of the Max Loads team!

Case Study from Max Loads

maxloads challenge

Max Loads can stand this challenge high above the ground too, lifting huge server house to the top of an airport.

For any logistics inquiry, please contact: +40 358 401 139 | +40 740 153 187 | office@maxloads.ro

Details:

To build a server house in an airport located in Palma de Mallorca Max Loads Team had delivered all the machines and tools. While the location did not allow they needed autocranes to put the machines on the top of the building and then they carry all of them in.

Top effort from Max Loads Team again. πŸ‘πŸ‘

#girn #maxloads #project #logistics #global #industrial #relocation #network #project #factoryrelocationprojectplan #industrialplantrelocation #factoryrelocation #movingafactory #Industrialrelocation #plantrelocation #globalrelocators