Case Study from Max Loads

maxloads challenge

Max Loads can stand this challenge high above the ground too, lifting huge server house to the top of an airport.

For any logistics inquiry, please contact: +40 358 401 139 | +40 740 153 187 | office@maxloads.ro

Details:

To build a server house in an airport located in Palma de Mallorca Max Loads Team had delivered all the machines and tools. While the location did not allow they needed autocranes to put the machines on the top of the building and then they carry all of them in.

Top effort from Max Loads Team again. πŸ‘πŸ‘