Project Update from Samoco

Samoco changed an old acid tank

πŸ” Samoco executed perfectly a task at Basf, Antwerp site.

They lifted, and changed an old acid tank with a huge 500t crane. The task was completed in time and they made an astonishing work.

Details:

Basf, Antwerp, on this site Samoco changed an old acid tank by order of Eurochem and Basf. The old tank was lifted out using a 500T crane, the new tank arrived by ship where it was unloaded using the 250T crane and transported by truck to its new location where it was placed using the 700T crane. With only a 3cm clearance between the existing structure and the new tank.

Well done Samoco. πŸ‘ πŸ‘

#girn #samoco #network #project