Case Study from SME Logistics

GIRN SME Pre-carriage & Port handling


A good memory with SME Logistics in christmas season of 2022 once they fully support their client delivered 2 units of ducting for NFE project in time. Under pressure of delivery schedule of the shipment required SME to be closed coordination with client, port authority, shipping agency in order to ensure all operations were taken place smoothly.

Details:

Project name: NFE project

Scope: Pre-carriage & Port handling

Cargo: Stack & ducting

POL: Phu My port

Total Quantity: 118 packages/3,786.15 cbm

Dimensions of main packages: 1650cm*420cm*450cm


Perfect work as always SME Logistics.


#girn #network #smelogistics #project

PARTNER NEWS – BRUNEL SHIPPING

GIRN Brunel FLAT RACK OOG Containers from Paranagua, Brazil into London Gateway, UK

Brunel with their Brazilian Partners Exalog, have shipped in 2 x 20FT FLAT RACK OOG Containers for WEG / Sulzer UK from Paranagua, Brazil into London Gateway, UK. Each Unit Consist of “A UN AC Three Phase Electric Motor”.

Cargo was instructed to be delivered on the flat rack units as loaded. With the expertise of Monaghan Freight, Ireland they managed permits and road diligence to get these transported to Wakefield, Leeds, UK.  

Details:

The cargo dimensions:

N.W : 21,600 KGS

G.W : 24,600 KGS

CBM : 62.160CBM

CONTAINER EXCESS :     

OVER RIGHT : 85CMS

OVER LEFT : 71 CMS

OVER HEIGHT : 150 CMS

In total we have delivered 4 Units.

Perfect job Brunel Shipping.


MEMBER NEWS – EAH – Europe Automotive Holding

GIRN EAH realized the installation of a CANNON press

MEMBER NEWS – EAH – Europe Automotive Holding


In cooperation with Cannon S.p.A. EAH realized an interesting and challenging project in November – the installation of a CANNON press. The project preparation took less than 2 months. Before starting the physical installation, it was necessary to measure everything perfectly, because there was not much space around the press installation.

After the arrival of all the machinery (Valla 250E, ENERPAC SL 400, SPMT Cometto ECO 1000 and Hyster S 7.00), the actual installation of the individual loads weighing up to 57t into the pre-prepared pits could begin. Thanks to the perfect readiness of the customer and the excellent guidance of the supplier of the CANNON baler, everything was managed on time and within 2 weeks the baler was up and running.


Perfect work as always. Well done EAH.


#girn #network #project #eah


Member News from Harder Logistics

Member News Harder

📢Member News from Harder Logistics

In the last period, Marcello Danielli of Harder has given several interviews, which we would like to share with you.

In addition, you can now watch a new video from Harder Logistics on the new Container hall on our website.

This is a fully automated container storage facility with online access for their customers and 24-hour access.

Marcello Danieli, Hermann Allgaier and their team can claim 317 company relocations in 7 years. Stefan Bottler asked this number and much more in a research interview for DVZ Deutsche Verkehrs-Zeitung. He summarized the news of their company in the current issue of the trade medium.

▶️Read more about it: https://www.dvz.de/login.html?redirect_url=/rubriken/detail/news/harder-logistics-versetzt-standorte.html

How did Harder Logistics become what it is today? In a portrait, Eva Hassa from VerkehrsRundschau looks at the development of Harder Logistics from a small office and machine moving company to a successful niche service provider.

▶️Read what prompted Marcello Danieli to jump into the cold water of logistics –https://www.verkehrsrundschau.de/nachrichten/transport-logistik/speditionsportrait-harder-logistics-erfolg-in-der-nische-3279080

#girn #network #harderlogistics #news #portrait #logistics #relocation #ulm #containerstorage

🆕 7WL involved into Biofuel Engine deliveries to Saudi Arabia

7WL involved into Biofuel Engine deliveries to Saudi Arabia 3

🆕 7WLogistics involved into Biofuel Engine deliveries to Saudi Arabia


Since more than 2 months already 7WL Bremen is involved into the delivery process for the“Red Sea” Project in Saudi Arabia.


The project as a part of Saudi Vision 2030 will be powered by solar power plants combined with battery storage backed up by GenSets. The scope of the order covers several different types of gensets with each engine optimized for use with climate-neutral B100 biofuel.


On behalf of its customer the 7WL Project Team is handling the deliveries of Gensets and add parts till FCA Loading Port in Europe, China as well as India.


No matter where – no matter what – 7WL is ready to assist you.. 💯


#girn #network #7wl #7worldwidelogistics #project #logistics

More of our Member project – Montron

GIRN Montron Project

We have a great project from Montron GmbH. Please welcome the Montron’s words with a warm greetings.

„Short videos and individual pictures only give a brief impression of what all our employees have to do day in, day out.

But a quick run-through can at least give a better overall impression.

We want to use this time to thank our business partners from GIRN and especially our employees for hundreds of thousands of working hours in 2022.

Montron GmbH wishes everyone a wonderful December and a relaxing and successful Christmas season.“

And we at the GIRN Team thank you for your kind words, and we’re glad you’re on the board Montron.

#girn #montron #network #project

PARTNER UPDATE FROM SME Logistics

SME Pre-carriage & Port handling

📢PARTNER UPDATE FROM SME Logistics

Successfully completed the transportation of 121 packages Module Stack and Ducting with total volume 5,103 cbm from a fabrication which located in the northern of Vietnam to the port of loading at Hai Phong city. The tight of delivery schedule of the project required SME to be closed coordination with all related parties as client, port authority, shipping agency and customs office in order to ensure all operations were taken place smoothly. Now the cargo is safety at its site.

DETAILS:

• Scope: Pre-carriage & Port handling

• Cargo: Module stack & ducting

• POL: Hai Phong port

• Total Quantity: 121 packages/5,103.11 cbm/532.73 Tons

• Dimensions of main packages:

Module 1: 1045cm*658cm*470cm

Module 2: 1232cm*565cm*478cm

Module 3: 1499cm*720cm*335cm

Module 4: 2272cm*355cm*370cm

Module 5: 2280cm*540cm*345cm

Perfect job SME Logistics 💯

#girn #network #project #smelogistics


Project Update from Montron GmbH

GIRN Montron Project Update

🔝Project update from Montron

“The new way of shipping” 💯

Montron GmbH has learned to swim together with WITS. A 35m long and 200t heavy bucket chain dredger is to be dismantled, packed, transported and reassembled. After 28 years in the same gravel plant, the upcoming work is very challenging.

Sure they can execute it due to the challenges they are the best. 👌

#girn #monotron #wits #project #update #dismantled #packed #transported #reasembled #together

🆕PROJECT ALERT FROM SME LOGISTICS

SME WORLDWIDE LOGISTICS THAI OIL CLEAN FUEL SRIRACHA Refinery

SME executed perfectly for their client a challenging task with ease. The cargo were De-oiled filter vessels and skids with the quantity of 28 packages and the weight of 288 tons. The shipment arrived safe and sound according to the schedule as always.

Details:

Due to the limitation in width and height of cargoes, it was impossible to transport cargoes from fabricator to the port of loading by land.

To tackle the problem, their experienced specialists did decide to shift all skids and vessels to a jetty near by the fabricator before the cargoes were loaded onto barges by combination of 2 mobile cranes.

All operations were taken place smoothly as an example of their ability in handling heavylift cargo. The safety is always their priorty in every movement of cargo.

SME did an excellent job. 👏 👏

#girn #network #smelogistics #project #cargo

Project Update from Samoco

Samoco changed an old acid tank

🔝 Samoco executed perfectly a task at Basf, Antwerp site.

They lifted, and changed an old acid tank with a huge 500t crane. The task was completed in time and they made an astonishing work.

Details:

Basf, Antwerp, on this site Samoco changed an old acid tank by order of Eurochem and Basf. The old tank was lifted out using a 500T crane, the new tank arrived by ship where it was unloaded using the 250T crane and transported by truck to its new location where it was placed using the 700T crane. With only a 3cm clearance between the existing structure and the new tank.

Well done Samoco. 👏 👏

#girn #samoco #network #project