Project Update from Noatum Project Cargo

NPL

📢 Project Update from our Partner Noatum Project Cargo.

Unity is strength within the Noatum Project Cargo and the Noatum Logistics Taiwan worked together to deliver heavy cargo to Datan power plant which is the largest gas-fired combined-cycle power plant in Taiwan.


Hats of for them they did an astonishing job 💯

#girn #noatumprojectcargo #project #logistics #global #industrial #relocation #network #factoryrelocationprojectplan #industrialplantrelocation #factoryrelocation #movingafactory #Industrialrelocation #plantrelocation #globalrelocators

Project Update from ETM & Montron

🔝Project Alert in GIRN Family.

The connections made at our Annual Meeting in May are not just our story to tell. 🤝

The collaboration between two of our great Members ETM and Montron started 8 weeks after the 1th GIRN Annual Meeting in Vienna.

We are very excited to show you.

Details:

Removal of Equipment at MSD in Krems, going to various costumers in Eurpope.

Packing done by WITS GmbH


All thanks to Montron and ETM for the conscience work. 👌

#girn #montron #etm #annualmeeting #global #industrial #relocation #network #Industrialrelocation #globalindustrialrelocation #project

Project Update from VPL

VPL

📢 Project Update from our Partner Viking Project Logistics.

The Viking Project Logistics delivered an extra heavy piece to receivers facility just in time as always. The team’s profil is very versatile.

Details:

They have arranged the unloading organisation and port operation. Then they delivered the 4xheavy piece to receiver’s facility according to the schedule.

Below services has arranged by Viking Project Logistics:
♦️Road permit
♦️Road protocol application
♦️Traffic sign, road arrangement application
♦️Port operation
♦️Cargo survey
♦️Transportation of the cargoes

126.7 ton – L 9.53 MT x W 5.43 MT x H 3.87 MT

124.9 ton – L 8.75 MT x W 5.558 MT x H 3.56 MT

113.3 ton – L 8.64 MT x W 4.62 MT x H 2.97 MT

If you prefer to work with #Viking, You just need to focus on your future projects.


Excellent work from VPL. 👍

#logistics #team #projects #Nocargoistooheavyforus #pressmachine #oversized #overweight #projectcargo #projectlogistics #girn #vpl #vikingprojectlogistics #project #logistics #global #industrial #relocation #network

Project Update from Klose

Klose installed beauties

📢Project Update from our Member Klose Industrial Service

Team Klose did an awesome work with these installed beauties. Everything for their customers.

They are making progress well. 👌

#girn #kloseteam #kloseindustrialservice #project #logistics #global #industrial #relocation #network #factoryrelocationprojectplan #industrialplantrelocation #factoryrelocation #movingafactory #Industrialrelocation #plantrelocation #globalrelocators

Project Update from Samoco Group

Injection Molding Machine

📢Project Update from our Member Samoco

That’s what we call a good teamwork. Samoco replaced two large Injection Molding Machine with their clients helpful cooperation.

This work speaks for itself.

Great job Samoco Team 👏

#girn #samoco #project #logistics #global #industrial #relocation #network #factoryrelocationprojectplan #industrialplantrelocation #factoryrelocation #movingafactory #Industrialrelocation #plantrelocation #globalrelocators

Project Update from Bauberger AG

bauberger 12t

📢Project Update from our Member BAUBERGER AG

Bauberger has no limits.

They lifted a 12 tonned machine on to a building. With their heavy-duty moving skates they csn easily delivered the machine remote controlled with millimeter precision.

Details:
Right next to the airport in Birrfeld (AG), Bauberger Team moved a 12t machine at SUHNER Schweiz AG to a new building and unloaded and brought a second one into the production hall.
 
The existing machine had to be lifted from plant 2 through the roof hatch, positioned on their truck and moved to the main plant. At the new location, they moved the 12t machine directly from the bridge of the truck via the lifting platform onto the ramp and through the entrance gate into the new production halls. Thanks to their electric heavy-duty moving skates, they were able to move the machine remote controlled and with millimeter precision through the entrance gate to the new location. Finally, they positioned the machine on the machine feet in the trough and pre-levelled it.

🏗Special tools
·       Truck
·       Beams and steel plates
·       Forklift truck 5t
·       Electric 15t heavy-duty moving skates

👀Watch on YouTube:
https://lnkd.in/e7CYq93t

🔝Not even the sky can stop these guys.

#girn #baubergerag #project #logistics #global #industrial #relocation #factoryrelocationprojectplan #industrialplantrelocation #factoryrelocation #movingafactory #Industrialrelocation #plantrelocation #globalrelocators

Project Update from Hess GmbH

hess bobst sp

🔝Project Update from our Member Hess GmbH.

The Hess GmbH gave top effort to take this huge Bobst Sp 142-CER in to it’s place.

Such a perfect work Hess GmbH. 👏 👏

#girn #hessgmbh #project #logistics #global #industrial #relocation #network #factoryrelocationprojectplan #industrialplantrelocation #factoryrelocation #movingafactory #Industrialrelocation #plantrelocation #globalrelocators

Case Study from EAH

eah case study dlap1500

📢 Project Update from our Member Europe Automotive Holding a.s.

A regular workday from EAH such as the day when they delivered the DLAP 1500 press and fully dismantle it and then relocated to it’s final new place. They have succesfully delivered for The Simpac company which is one of the greatest press-manufacturer company in South-Korea.

Details:

EAH Team successfully completed this move for SIMPAC, a Korean company that is a market leader in the South Korean forming technology sector and one of the world’s leading press manufacturers.

How to move a press

Thorough planning is essential before starting any such large-scale operation, which in this particular case took them 7 days. This was a really big project – 7 trucks were needed just to transport the necessary tools. First of all, the entire plant had to be dismantled, which was done by an Enerpac SL400 hydraulic gantry system with a total load capacity of 400 tonnes. This gantry crane with hydraulic side shifts is ideal for lifting machinery and heavy loads in areas with limited handling capacity, such as production halls and the like. In order to move the DLAP 1500 press to its new position, they had to disassemble it into parts weighing between 65 and 165 tonnes and load it onto a COMETTO transport chassis.

Transporting heavy parts requires special equipment

Transporting equipment such as the DLAP 1500 press cannot be done with conventional trucks, so they used a self-propelled SPMT COMETTO ECO 1000 chassis with a load capacity of up to 174 tonnes to transport all the heavy parts, including the massive 165-tonne press crown. They are the only company in the Czech Republic that owns this type of transport equipment. In the meantime, the construction company had already prepared the pit at the destination, into which the press was installed after transport.

The entire transfer of the baler took only ten days, and the subsequent installation at the destination was completed by five specialists within another week. For a project of this magnitude, this is a very short time, which was made possible in particular by the flawless coordination between SIMPAC, theirselves and the construction company that prepared the site for the installation.

No challenge is big enough for them.

After 17 days, the DLAP 1500 press was ready to carry out its demanding tasks at its new location, and they could celebrate another successful job and look forward to the challenges ahead.

A succesful move for EAH.🙌🙌

#girn #eah #europeautomotiveholding #project #logistics #global #industrial #relocation #network #factoryrelocationprojectplan #industrialplantrelocation #factoryrelocation #movingafactory #Industrialrelocation #plantrelocation #globalrelocators

Project Update from Klose Industrial

klose 1600 tons

📢 Project Update from our member Klose Industrial Service Sdn. Bhd.

Team Klose done a great job with this 1600 tons of total weight with the challenges of time and the Covid19.

Impressive Klose Team. 💯

#girn #kloseteam #kloseindustrialservice #project #logistics #global #industrial #relocation #network #factoryrelocationprojectplan #industrialplantrelocation #factoryrelocation #movingafactory #Industrialrelocation #plantrelocation #globalrelocators

Project Update from VPL

Viking Rostov to Volkhov

📢 Project Update from our Partner Viking Project Logistics.

A heavy task but not for these guys. From Rostov to Volkhov the Viking first discharging and then this 37 pieces in no time.

This great work done by Viking Project Logistics 👏 👏


#girn #vikingprojectlogistics #vpl #project #logistics #global #industrial #relocation #network #factoryrelocationprojectplan #industrialplantrelocation #factoryrelocation #movingafactory #Industrialrelocation #plantrelocation #globalrelocators