HARDER Logistics – “Hands on” at the Ulm Museum

HARDER logistics supports the move.

Due to upcoming renovation and reconstruction measures, a large part of the Museum Ulm has to be cleared. HARDER logistics is once again actively supporting the museum with its logistics expertise. The team is transporting some of the collection items and particularly large-format works of art and preparing them for interim storage in the central art depot.

Perfect job Harder Logistics

Relopack Invitation – LogInPack International Congress for the Logistics and Packaging Industry

Our member Relopack is pleased to invite you to the LogInPack International Congress for the Logistics and Packaging Industry.

The LogInPack Conference will be an excellent opportunity to make valuable contacts , exchange experiences with other professionals and meet industry experts. Not only will you expand your knowledge, but you will also receive inspiration to take on new challenges and develop your companies.

Sign up today for the LogInPack conference and join a unique community of leaders who are creating the future of industrial packaging and logistics.

The conference is co-organised by Relopack.

For more information on the conference :  https://www.targikielce.pl/en/loginpack

Or please contact directly : Krzystzof Maludy – k.maludy@relopack.com

D&P PROJECTS – MOTOR OIL – REFINERIES IN KORINTHOS – GREECE

#globalrelocators #industrialrelocation #industrialrelocationservices #relocationindustry #movingafactory #industrialplantrelocation #globalrelocation #factoryrelocationservices #globalindustrialrelocationnetwork #girn #globalrelocation #plantrelocation #relocationnetwork

From the first days of May a D&P Projects team is working on a big Project in Motor Oil, the biggest refineries of Greece.

In the Shutdown of the refineries, D&P Projects dismantle and install new exchangers and air Coolers.

With the help of Cranes and with careful actions that are necessary especially in refineries, D&P Projects succeed to complete all the Project many days before the deadline.

7 Worldwide Logistics Power Plant Project Bangladesh

Already in September 2022 the 7WL Project Team has started the operations for the transport of a 150 MW power plant to Bangladesh on behalf of their customer MAN Energy Solutions.


The “heart” of the power plant will be 9 × MAN 18V48/60 TS engines which will finally produce reliable energy end 2023 in Sreepur – located in the north of Dhaka.


The complete logistic operations took around 6 months with constant cargo flow of 40’ Flats / 40’OT OT and HC Container from many different places in the world like Finland, India, China, Greece, Spain and Northern Europe.

The highlight of the project has been – without any doubts – a part charter with 2 separate loading ports in Europe ending by direct discharging into consignees barges in Mongla.

ex Saint Nazaire, France

9 Engines / each 1300x490x650 / each 320 tons9 TCA / each 520x360x360 / each 32 tons

ex Bilbao, Spain

9 Alternators / each 645 x 384 x 406 / each 71 tons

Watch the full video HERE

KGE Global Logistics – Bogies from India to Kazakhstan

KGE Global Logistics - Bogies from India to Kazakhstan

KGE was nominated to transport 3 x Bogies from Kurali, India to Nur sultan Kazakhstan via multimodal mode of transport.


3 PCS of OOG cargo moved on 1 x 40’FR and 1 x Wagon. Dimensions of Bogie: 4.70 x 2.97 x 2.16 M Weight 9675KG.
This shipment is moved from Kurali on a flatbed to Mundra port and via Sea till Georgia, there it was loaded onto Wagon to final destination in Kazakhstan.


Their highly trained staff did survey in India and also in Georgia after loading and provided to the client along with complete daily tracking which result to a satisfactory feedback from their customer.

Member Update – Harder Logistics

GIRN HARDER recently "removed", as it is called in logistics jargon, 13 mixing units used in the cosmetics industry

Sophisticated project logistics at HARDER logistics – They recently “removed”, as it is called in logistics jargon, 13 mixing units used in the cosmetics industry, each weighing 5 tonnes, from a factory. The challenge: a false ceiling was installed around the mixing units.


They approached the project in three steps.

Step 1:

HARDER installed a hydraulic lifting system on the floor on top and used it to lift the mixing plants to the floor above.


Step 2:

On the upper floor, the mixing plant was placed on its side, as it did not fit through the façade when standing upright.


Step 3:

With the support of their assembly platform, the heavy weights were craned out of the building using a truck-mounted crane.


This spectacular removing of the mixing units was only one part within a factory relocation from Germany to Poland and Spain. The entire project was realized with 12 employees in two phases of 5 weeks each. The freight volume, which also included 3 complete filling lines, comprised 30 truckloads.


Perfect job Harder Logistics

Member News – KGE Global Logistics

GIRN - KGE 2 X Pump from Jebel Ali, UAE to Kazakhstan

KGE was nominated to transport 2 x Pumps from Jebel Ali, UAE to Kazakhstan
2 PCS of OOG cargo moved on 40’FR(OH)


Dimensions:

5.790 x 2.110 x 2.950 M Weight 9650KG / Pump


This shipment is moved from Jebel Ali to Mersin port on 40’FR and from there it was loaded onto two Trucks to different final destinations.


These both pumps were successfully delivered to their respective destinations with support of their highly skilled and dedicated team.


Perfect job KGE Team.

Member Update – Montron GmbH

Montron GmbH Charity

Since inflation, daily life is becoming more and more expensive. From food prices to fuel bills, as well as rent, electricity and gas – the additional costs are almost unmanageable, especially for low-income families.


But there is a glimmer of hope: companies can help improve the living conditions of these families by providing free services and enable them to lead a better life. For this reason, Montron GmbH has decided to support socially disadvantaged families and children.


The first project of this kind was a pro bono assembly for the after-school care center of the Wiener Bedarfshilfe. Two of our employees assembled four IKEA chests of drawers. The chests of drawers serve as storage space for the children and were accepted with great enthusiasm.


They are proud to have made a small contribution to improving the lives of these children and hope that other companies will follow this example. Because together we can make a big difference and help make the world a better place.


“We can’t help everyone, but everyone can Help someone.”

Max Loads – 3 transformers installed in the future BMW factory in Debrecen

GIRN MAXLOADS 3 transformers installed in the future BMW factory in Debrecen

Member News from Max Loads
3 transformers installed in the future BMW factory in Debrecen(Hungary)

Details:

  • 3 Siemens transformers
  • 6200 x 2400 x 3440
  • 61.1 tons each

  • With a team of 8 people on site
  • 25t forklift, truck with 10t crane and a big crane of 75t
  • Of course the hand tools and the rigging tools

At the future BMW factory in Debrecen they installed 3 transformers, which they put in their final place, installed all the ancillary equipment and filled with oil.

It was a project for approximately 3 month


Congratulations for the wonderful work of the Max Loads team!