JOIN OUR NETWORK

Wrasse climbing gourami amur pike Arctic char, steelhead sprat sea lamprey grunion. Walleye

Contacts
Location
523 Sylvan Ave, 5th Floor
Mountain View, CA 94041USA

Shipment of Steel Frame Furnace by VPL

FOB Tekirdag Port to FOT Kocaeli Job site – 2 x BB + 3 X 40’FR + 2 X 40’HC

Viking Project Logistics has completed another shipment on Saturday, 09.10.2021.

They carried 2 x BB + 3 X 40’FR + 2 X 40’HC of Steel Frame Furnace from FOB Tekisrdag Port to Kocaeli Job site by 5 lowbeds + 2 standard trucks.

Viking Project Logistics has also arranged lashing/securing & tarpaulin operation at the port of Tekirdag due to the damaged tarpaulin of goods.

They moved the Steel frame with dimension 2 pcs – 711,2 x 393,7 x 457,20 – 49100 kgs & 10.5 x 4.6 x 4.2 mt – 18500 kgs from port of Tekirdag to Kocaeli Job site.

The shipment details are as below :

Port of Discharge: FOB Tekirdag

Place of Unloading: Kocaeli,Turkey

Cargo detials:

2 pcs – 711,2 x 393,7 x 457,20 – 49100 kgs

11 pcs – 10.5 x 4.6 x 4.2 mt – 18500 kgs

2 PCS – 10.85 X 3.1 X 2.35 MT – 17500 KGS

2 X 40 HC The cargo was sent us by our India agency.

#girn #vpl #turkey #project #cargo #logistics