The Conclusion of Industrial Relocation Project from Northen Finland
350 x 40βequipment moved over the duration of 8 months, ending off with
3500 m3 Break Bulk loaded onto vessel during challenging weather
conditions in Northern Finland.
The complete production line was safely delivered to place of receipt 3rd week of December 2023.
Relocation / Production Line
Length: 200 meters
Width: 6 meters
Height: 18 meters
Weight: Abt. 4000 mt