SCOPE

SDEM Erectors Nigeria Limited was engaged to handle the Material Reception; – Offloading & Stacking, Mechanical and Electrical Installation of the GTG and BOPs, Pre-commissioning and commissioning activities including minor procurements.

DISMANTLING & SHIPPING

The LM 2500 Gas Turbine & Generator has 2 Units bought from UAE.

MATERIAL RECEPTION

SDEM Erectors received the Materials and stacked appropriately taking cognizance of installation requirements and order of erections. Material Reception and Offloading were adjacent the engine floor/room

INSTALLATION – Gas Turbine Generator

SDEM skidded the Gas Turbine Generator onto the foundation after confirming the anchor bolts arrangement and positions ensure that the corresponding Easting & Northing are accurate, Precision shimming for the Turbine alignment was carefully done after the installation of the refurbished Turbine.     

BOP INSTALLATION

The Compressor, Hydraulic & Lube oil skid as well as other BOPs were Positioned as well as other auxiliaries.

PRE-COMMISSIONING & COMMISSIONING

SDEM Erectors Nigeria Ltd personnel carried out the Electrical installations (cable routing and laying, termination and testing) and executed the instrumentation and equipment calibrations. SDEM experienced services engineers also performed several equipment pre-commissioning and supported the commissioning.